US$ 899.50
Oplev en ny dimension inden for varmestyring med LK 840 og drag fordel af maksimal effektivitet
For heating systems with boiler and storage tank or buffer tank for pump control
you can continuously adjust the primary and secondary air supply via a lever below the combustion chamber
The storage unit
anschlusspaket attack slx profi lambda kupfer t stueck profipress Parcel selection:Press fitting Oplev en ny dimension indenConnection package Attack SLX Profi Lambda Connection package Solid fuel boiler Wood gasifier The connection package (basic) consisting of: 1x return temperature increase 70C or 72C including high efficiency pump, thermometer and insulation, 1" 1x boiler safety group 1" 50kW 1 x Thermal drain safety device 3 4" 1x boiler filling and draining tap " brass 1x double nipple black 1" 1x reducing double nipple black 1"x1" 1x pipe nipple black 1"x120mm 1x
US$ 899.50
US$ 200.00
US$ 185.00
US$ 175.00
US$ 300.00
US$ 199.50
US$ 1800.00
US$ 600.00
US$ 275.00
US$ 750.00
US$ 399.50
US$ 250.00
US$ 600.00
US$ 250.00
US$ 1000.00
US$ 120.00
US$ 225.00
US$ 400.00